In 2026, the Town of Salisbury is undertaking a number of capital projects. For the latest updates, please refer to this webpage. Prior to commencement of construction, hand-delivered notices are provided to properties in the immediate vicinity of the project site(s).
During capital projects, residents can experience additional noise, traffic, and related disruptions. The Town appreciates the patience of residents as we undertake these exciting projects this year.
For additional information and/or complaints related to capital construction, please phone the Town Office at 506-372-3230 or email info@salisburynb.ca.
Dundee Drive: Pulverize and Re-Surface (Existing), and Asphalt Wearing Surface (Extension)
This project will involve the installation of the asphalt wearing surface on the extension of Dundee Drive (between MacDonald Road and the former dead-end), as per Residential Subdivision Agreement No. 3. In addition, the Town will also be undertaking a pulverize and re-surface project between the dead-end and Braemar Street. This will involve the pulverizing and re-surfacing of 250-metres of street. Pulverizing involves the recycling of existing asphalt to create a more suitable base, followed by fresh asphalt to re-surface the street.
Start Date: September 14, 2026
End Date: October 2, 2026 (weather permitting)
Latest Update: Project is expected to be undertaken in September 2026. Public notices and resident door knockers will be delivered prior to the start of the work.
Eagle Ridge Drive
This project will consist of the asphalt wearing surface of Eagle Ridge Drive, a new residential street, being undertaken in the Town’s Capital Works Program as per Residential Subdivision Agreement No. 1.
Start Date: September 14, 2026
End Date: October 31, 2026
Latest update: This work is expected to occur in mid/end of September into October.
Town Hall – Solar Panel Installation
This project will involve the installation of roof-mounted solar panels on Town Hall (56 Douglas Street). The system will include 88 solar panels and is expected to generate over 82% of the power consumed at 56 Douglas Street. This project is a partnership between the Town and TruSun Energy, whereby the upfront costs are reduced to the equivalent amount of the NB Power rebate for panels, with the energy savings cost-shared over a 20-year period between the Town and TruSun.
Start Date: October 1, 2026
End Date: December 31, 2026
Latest update: Final stages of preparation are being undertaken with installation and testing expected prior to year-end.
SFR Station – Solar Panel Installation
This project will also involve the installation of roof-mounted solar panels on Town Hall (56 Douglas Street). The system will include 80 solar panels and is expected to generate over 84% of the power consumed at the new Fire Hall. As part of the capital construction work on the fire hall, the solar panel conduits were installed and are ready for installation. This project is a partnership between the Town and TruSun Solar, whereby the Town pays approximately $55,000 ($30,000 in capital contribution, ~$25,000 from NB Power) and for a 15-year period, cost-shares the energy savings with TruSun.
Start Date: October 1, 2026
End Date: December 31, 2026
Latest update: Final stages of preparation are being undertaken with installation and testing expected prior to year-end.
2026 Trail Extensions
This project will involve the construction of approximately 1.4 kilometres of stonedust trail to add to the Town’s existing trail network. This will include a connection to the new sidewalk on River Road, providing a connection to the future elementary school lands and the existing trail, as well as to Main Street beside the Salisbury Baptist Church. The second portion/phase of this years work includes a connection to the shared ATV/Pedestrian trail via the Silver Meadows Trailer Park, connecting near the Wastewater Treatment Facility (and including a new parking area).
Start Date: May 27, 2026
Completion Date: Ribbon-Cutting for Riverside Trail held October 13, 2026
Latest Update: The final stages of the trail were being undertaken in early Fall, including completion of the railing approaching the Salisbury East Wetlands and the installation of bench pads and landscaping. A small portion on SBC property, between Main Street and the rear of the parking lot, requires re-location of a guide wire which is awaiting NB Power.
View PDF of New Trail Map HERE

River Road Storm and Sidewalk Extension
This project will consist of the extension of storm sewer on River Road as well as the extension of sidewalk, both on the East Side of the street. This project is being undertaken in anticipation of the P380 bridge commencing in 2027.
Start Date: April 13, 2026
Anticipated Completion Date: June 5, 2026
Latest Update: This project has been completed as of early June.
Elementary School Land Purchase
This project entails the acquisition of 20.1 acres of land for the site of the future Elementary School. The Town is acquiring this parcel and providing it to the Province of New Brunswick for $1. In exchange, the Town is receiving a portion of the new school site for a future recreation facility and is receiving the baseball fields and trail area, currently on Provincial land.
Start Date: February 27, 2026
End Date: May 30, 2026
Latest update: The Town has acquired and purchased the land. The exchange with the Province of New Brunswick has now commenced. This exchange includes the swap of the current baseball fields to become Town-owned land.